TRAINMASTER BY WERNER MEER  US-RAILROAD-SHOP KILCHBERG
HOCHWEIDSTRASSE 3  CH-8802 KILCHBERG (ZÜRICH) SWITZERLAND (founded 1977)
PHONE *41-44-715-3666, FAX *41-44-715-3660, E-MAIL trainmaster@bluewin.ch
Go back to our Website - click here

updated: May 13, 2022

Cajon Pass Photo Collection
October/November, 2015
by Werner Meer, Switzerland
Part 8: Natural Flyover at Victorville (130 Photos)

 

Abbreviations found on this page: EB = East Bound, NB = North Bound, SB = South Bound, WB = West Bound, MP = Mile Post,
MT-1 = BNSF Main Track 1, MT-2 = BNSF Main Track 2, MT-3 = BNSF Main Track 3, UPT = UP Track (Colton-Palmdale Cutoff),
DPU = Distributed Power Unit (Helpers), EOT = End of Train, DBS = Double Stack Train, TOFC = Trailer on Flat Car (Piggy Back),

For bigger size photos - please click on the 4- or 5-digit number below each photo.

Gray's Hill at Victorville (October 30, 2015)
First, we start with an overview and some words about the new bridge construction over the BNSF Main Tracks near the flyover
WM 6/02/10 To a Werner Meer aerial of the BNSF Flyover / Gray's Hill, I've added straight line approximations of where the new roads will traverse the hill. Note that 'the Hill' is steeply sloped and 125+ feet higher than the terrain containing the existing roads being connected. - 007

Edited Google Earth of entire project. - 020
In the Phase #3 are --- Greentree BLVD extension (PURPLE), the area of the new vehicular bridge, and “Gray’s” Hill are shown. The “G” at the lower center is the approx. location of the Gray residence.

Back in 2016, I (GGG) started a new photo series “The Demise of Gray’s Hill” in conjunction with a rather large local Government project to provide a fifth roadway between Apple Valley and Victorville / Hesperia / I-15.
 
These projects are necessary, not only for normal vehicular traffic but, for emergency traffic in this earthquake prone area. Three of the roadways have existed for many years but one accident would clog the other two roads for hours. 
 
The hyper expensive factors in this construction are that all five, of these arterials, must cross the normally dry Mojave River, its tributaries and the very busy BNSF RR Cajon sub-division. What's important to we Raifans is that this latest construction must bridge the tracks very near the "natural crossover / flyover" at MP 39.1 of the BNSF Cajon Sub---and how the new road will affect the hill overlooking the flyover (our photographic viewpoint, locally known as "Gray's Hill"). 
 
This latest project is being built in three phases: 
 
Phase #1: (Apple Valley) includes widening & improving Yucca Loma Rd and building a 4 lane vehicular bridge across the Mojave River --- COMPLETED.
Phase #2: (County of San Bernardino) includes widening & improving  Yates Rd --- COMPLETED
 
Phase #3: (Victorville) will include extending Greentree BLVD and building a 4 lane vehicular bridge across the BNSF CAJON SUB
under construction
Spring Valley Lake - 111369 111370
111371 111372
111373 111374
111375 111376
from left: Mac (a retired WP & UP employee) Gary, Marc - 111381 natural Flyover at MP 39.1 (near Frost) - 111377
111379 1st Train UP EB Intermodal - 111382
well, whar can we do, the light is against us - 111384 Tarin 1 is going under the flyover - 111385
now, the train is turning into good light conditions - 111386 111387
111388 111389
111390 111391
111392 111393
there are 2 rear end DPU's face-to-face - 111394 111395
111396 111397
111398 last photo of Train 1 UP EB - 111399
Train 2 BNSF WB coming from Frost - 111400 111401
111402 111403
usually WB traffic is going over the flyover - 111404 111405
111406 111407
111408 111409
111410 111411
111412 111413
in between is an empty  5-unit well cars set - 111414 111415
Train 2 is having 2 rear end DPU's - 111416 111417
111418 111419
last photo of Train 2 WB manifest - 111420 Train 3 another BNSF WB intermodal - 111421
111422 111423
111424 111425
111426 111427
111428 111429
111430 at the same time Train 4 BNSF EB is coming - 111431
111432 111433
111434 111435
111436 111437
111438 111439
that's what we like best two trains on and under the flyover - 111440 111441
111442 111443
111444 111445
111446 111447
111448 111449
111450 111451
111452 111453
last photo with Train 4 BNSF EB - 111454 Train 3 BNSF WB is having 2 mid train DPU's - 111455
111456 111457
111458 in addition, there is one rear end DPU - 111459
111460 111461
111462 111463
last photo of Train 3 BNSF WB intermodal - 111464 some Joshua Trees while waiting for the next train - 111465
next is Train 5 UP EB on lower level - 111466 111467
111468 111469
111470 111471
111472 111473
111474 111475
111476 111477
111478 111479
111480 111481
last photo of Train 5 UP EB intermodal - 111482 next Train 6 BNSF local with only 6 covered hoppers - 111483
111484 111485
111486 111487
111488 111489
111490 last photo of Train 6 BNSF EB local - 111491
next is Train 7 UP work train with ballst load - 111493 111494
111495 111496
111497 there are 20 loaded ballast cars - 111498
111499 111500
111501 last photo of Train 7 UP EB and rom Gray's Hill - 111502
With my small digital camera, I took some bonus photos on top of Gray's Hill checking the Joshua Trees.
5053 5054
5055 5056
5057 5060
5058 5059
Mac, Mark, Gary and me (Werner) had . . . 5049 . . . . a great time on Gray's Hill - 5062

take a look at the Green Tree Blvd. Bridge Project (below)

Cajon Pass Sub
Photo Collection 2017-2022


Green Tree Blvd. Extension (Victorville, CA)
w/new bridge over BNSF Main

Gary G. Gray, Marc Fournier (USA)

Updated: 5/03/22
GGG 6/15/15 Upper Norrows Mojave River
(view from Gray's Hill) - 001
See first 425 photos - click here GGG 12/28/15 UP EB at MP 39.1
(view from Gray's Hill) - 002

All photos copyright by Werner Meer

Cajon Pass Photo
Collection Part 1
Hill 582
October 28-31, 2015
a detailed look at Hill 582
by Werner Meer
Switzerland

updated: 10/01/2017

See all 156 photos - just click here

 

Cajon Pass Photo
Collection Part 2
Hill 582
October 28, 2015
27 trains around Hill 582
by Werner Meer
Switzerland

updated: 10/01/2017

See all 428 photos - just click here

 

Cajon Pass Photo
Collection Part 3
Hill 582
October 30-31, 2015
14 & 24 trains around Hill 582
by Werner Meer
Switzerland

updated: 10/06/2017

See all 459 photos - just click here

 

Cajon Pass Photo
Collection Part 4
Sullivan's Curve
October 29 and Nov. 1, 2015
3 diff. visits to Sullivan's
by Werner Meer
Switzerland

updated: 10/19/2017

See all 494 photos - just click here

 

Cajon Pass Photo
Collection Part 5
Summit & Silverwood
October 31 and Nov. 1/2, 2015
4 diff. visits to these locations
by Werner Meer
Switzerland

updated: 11/22/2017

See all 510 photos - just click here

 

Cajon Pass Photo
Collection Part 6
Mormon Rocks & Highway 138
October 28 to Nov. 8, 2015
several visits to this locations
by Werner Meer
Switzerland

updated: 5/13/2022

See all 740 photos - just click here

 

Cajon Pass Photo
Collection Part 7
Alray former Tunnels Area
November 1, 2015
one visit to this location
by Werner Meer
Switzerland

updated: 5/13/2022

See all 83 photos - just click here

 

Cajon Pass Photo
Collection Part 9
Barstow, Colton and Bonus
October 29 & 30, 2015
one visit to these locations
by Werner Meer
Switzerland

updated: 6/16/2022

See all 197 photos - just click here

 

8 different and detailed Maps of Cajon Pass with captions (Mile Posts and Location) by Gary G. Gray - click here
New 8/11: Maps "How to find" Hill 582, Sullivan's Curve, Noisy Point by Gary G. Gray - click here
Accurate Map of Cajon Pass with 3rd Main Track by Michael Amrine - click here

Go back to my Cajon Pass 2015 Main Page - click here

Go back to Cajon Pass Main Page - click here

Home Cajon Pass Photo Gallery California Photo Gallery HO Mojave Desert Layout